Epson ET-7700, ET-7750, L7180, L7188 Service Manual Page 61-80

Epson ET-7700 / ET-7750/L7180/L7188 Revision D Disassembly/Reassembly Routing FFCs/Cables 61 Confidential Tank Cover Open Sensor cable Route the Tank Cover Open Sensor cable through the two hooks on the FFC Cover Frame. Route the Tank Cover Open Sensor cable in the groove on the Panel Frame. Route the Tank Cover Open Sensor cable through the two hooks and the three slits on the Housing Tank Assy. Hook Hook FFC Cover Frame Tank Cover Open Sensor cable Tank Cover Open Sensor cable Tank Cover Open Sensor Hook Hook Slits OK NG Panel Frame Groove Tank Cover Open Sensor cable Housing Tank Assy Power Supply cable Route the Power Supply cable referring to the following items. Route the Power Supply cable through the hook on the Hinge Holder. Route the Power Supply cable through the five hooks on the Air Chamber Assy. Route the Power Supply Cable through the three hooks and the slit on the Tank Cap Assy. Set the ferrite core of the Power Supply cable in the position shown above, and route the cable through the five slits on the Panel Frame. Hinge Holder Hook Power Supply cable Key Slot Assy Power Supply cable Hooks Power Supply Board Assy Ferrite core Slits Panel Frame Slits Hooks and slits Key Slot Assy Air Chamber Assy Hooks and slits Guide Tube Air Chamber Hook Power Supply cable Key Slot Assy
Page 1 of 20

Epson ET-7700 Service Manual Page 61-80
Epson ET-7750 Service Manual Page 61-80
Epson L7180 Service Manual Page 61-80
Epson L7188 Service Manual Page 61-80